Proceso de producción

En CABLES, mass production follows strict standard operating procedures to ensure consistent quality and reliability.

Step 1: Crimping

Terminals and wires are crimped using semi-automatic or fully automatic equipment. Quality checks include:

  • Crimp height
  • Crimp width
  • Pull force testing
Engaste semiautomático

Engaste semiautomático


Prensado totalmente automático

Prensado totalmente automático

Paso 2: Montaje

Pre-assembled semi-finished wires are arranged on manufacturing fixture boards to ensure accurate:

  • Branch routing
  • Harness dimensions
  • Assembly positioning

Montaje de placas de fijación dedicadas a la fabricación

Step 3: Inspection & Detection

  1. Appearance inspection:
    Form-fitting gauges are used to check for:
    • Wire damage
    • Exposed conductors
    • Loose fasteners
  2. Electrical testing:
    Dedicated testing equipment verifies circuit conductivity and connection accuracy.
Inspección de aspecto y dimensiones

Inspección de aspecto y dimensiones


Pruebas funcionales

Pruebas funcionales

Etapa 4: Envasado

  • Cartons are lined with dust-proof bags and equipped with 50g desiccant packs
  • After reaching the standard packing quantity, products are secured with cardboard covers
  • Dust-proof bags and cartons are then fully sealed
Coloque bolsas antipolvo planas dentro de la caja de cartón

Coloque bolsas antipolvo planas dentro de la caja de cartón


Pre-fijar con un cubreobjetos

Pre-fijar con un cubreobjetos

Paso 5: Envío

Finished products are prepared for shipment according to customer logistics requirements and transportation standards.

Mercancías pendientes de envío

Mercancías pendientes de envío